approximate cost (section wise)
considering 100 klpd ethanol/ena plants.

1. Grain silos & millsection =6cr (4.3%)
2. Liquefaction & Fermentation =15cr (10.71%)
3 .Distillation &Evoppration=28cr(20%)
4.DDGS Drier(1no)=8cr(5.71%)
5. WTP &ETP=5.5cr(3.93%)
6. Fire fighting systems =5cr(3.57%)
7. Boiler with ESP & Fuel handling plant =10cr(7.15%)
8. steam turbine =5cr(3.57%)
9. Decanters 3nos=2cr(1.43%)
10. Receivers & Storage tanks =6cr(4.3%)
11. Electrical motors & Pumps =5cr(3.57%)
12. pipelines & fittings =3cr(2.15%)
13. Structural materials =12cr(8.57%)
14. civil works =15cr(10.71%)
15. Fabrication, Erection & Commissioning =5cr(3.21%)
16. Electrical motors, panels, pumps =5cr(3.57%)
17. Admin office, store section & Toilet block =4cr(2.85%)
18. Structural painting & wall painting =3cr(2.15%)

It should be noted that 18% GST & Transportation costs are extra as applicable at the time of delivery.