100 KLPD ENA/ Ethanol Project
[2013-2024 Karthik Agro Industries PVT]
About
EBP blending program initiated by government of India to blend 20% ethanol with petrol to be achieved by 2025. Incentives provided by government of India to set up new ethanol plant gave the idea to implement this project.
Roles and Responsibilities
- Concept to Commissioning.
- Specification of plant and machineries.
- Project finalisation with plant suppliers.
- New boiler installation and commissioning.
- New turbine installation and commissioning.
- Utilities:
- Air compressor
- Water treatment plants
- Effluent treatment plants
- DM plants
- Cooling towers
- Flour mil section with grain silos.
- Liquification plants.
- Fermentation plants.
- Distillation plants.
- MSDH plants.
- Evaporation plants.
- DDGS driers.
- Electrical and instrumentation selection and implementation.
- Civil design and implementation.
- Structural design and implementation.
- Selection of pipes and valves.
- Project completion and commissioning achieved with desired quality and projected capacity.
- Liasoning with government authorities such as boiler inspector, electrical inspector, factory inspector, safety inspector and PESO.
65 KLPD RS to Ethanol Project
[2013-2024 Karthik Agro Industries PVT]
About
EBP blending program initiated by government of India to blend 20% ethanol with petrol to be achieved by 2025. Incentives provided by government of India to set up new ethanol plant gave the idea to implement this project.
Roles and Responsibilities
- Concept to Commissioning.
- Project Identification and getting EC.
- Obtaining CFE and CFO from respective PCB.
- Specification of plant and machineries.
- Project finalisation with plant suppliers.
- New boiler installation and commissioning.
- New turbine installation and commissioning.
- Utilities:
- Air compressor
- Water treatment plants
- Effluent treatment plants
- DM plants
- Cooling towers
- Flour mil section with grain silos.
- Liquification plants.
- Fermentation plants.
- Distillation plants.
- MSDH plants.
- Evaporation plants.
- DDGS driers.
- Electrical and instrumentation selection and implementation.
- Civil design and implementation.
- Structural design and implementation.
- Selection of pipes and valves.
- Project completion and commissioning achieved with desired quality and projected capacity.
- Liasoning with government authorities such as boiler inspector, electrical inspector, factory inspector, safety inspector and PESO.
Enhancement of existing 65 KLPD ENA plant to 100 KLPD
[2013-2024 Karthik Agro Industries PVT]
About
Increasing the capacity of the existing plant.
Innovation and Achievements
- Modification in the equipment with negligible investment.
- Process modification resulted in achieving capacity up-to 100 KLPD with desired quality.
- Increased boiler capacity from 16 TPH to 18 TPH.
- Addition of extra cooling tower to de-bottle neck the requirement of cooling water for process application.
- Conservation of electric power by providing VFD's whereever required.
- Enhancing efficiency optimum requirement to continue operation of the plant more than 330 days in a year.
Other projects
[1995-2008 Deepak Nitrite | 2011-2013 Vinati Organics LTD]
- Implementation of chemical projects such as pracumidine, ONA, MCA, OPDA, nitroxylene, ATBS along with required utilities.